[dsm_image_carousel gallery_ids="20444,20436,20438,20439,20440,20443,20441,20445" slide_to_show="3" speed="700" autoplay_speed="1600" space_between="18" arrow_position="inside" arrow_prev="on" arrow_prev_font_icon="4||divi||400" arrow_next="on" arrow_next_font_icon="5||divi||400" arrow_size="34px" dots="off" arrow_color="#ffffff" arrow_background_color="RGBA(255,255,255,0)" slide_to_show_tablet="3" slide_to_show_phone="2" slide_to_show_last_edited="on|phone" arrow_horizontal_position_tablet="" arrow_horizontal_position_phone="45%" arrow_horizontal_position_last_edited="on|phone" arrow_size_tablet="34px" arrow_size_phone="25px" arrow_size_last_edited="on|phone" _builder_version="4.27.4" _module_preset="default" custom_margin="||0px||false|false" animation_style="slide" animation_direction="top" animation_duration="600ms" animation_intensity_slide="2%" hover_enabled="0" border_radii_arrow="on|50px|50px|50px|50px" locked="off" global_colors_info="{}" theme_builder_area="post_content" sticky_enabled="0"][/dsm_image_carousel]
CFDC, Primary Connect
On a 28,366msq site, this 11,500sqm development will provide Countdown with a purpose-built distribution facility for its fresh and perishable product lines.
The facility includes the Distribution Centre warehouse, canopy, offices, gatehouse and entry lobby, and 59+ car parks.
Sustainability is again front of mind with this development with features including rain water harvesting, energy efficient lighting and solar panels. The building is being built to achieve a 4-star Green Star Certification Rating under NZGBC.
PRODUCTS USED
- Stair Systems
- Louvre Screens
- Caged Ladders
- Walkways
- Handrails
- Step-overs
